# Working with a local builder and a remote designer

*Guide · 6 min read*

Source: https://koedesign.co/journal/local-builder-and-remote-designer

A designer in one city and a builder in another can work very well together. What makes it work is not distance. It is clear drawings, clear roles and a few good habits from the first day.

## Who does what

Most problems on a project come from no one knowing whose decision something is. Agree on it before work begins:

- **The designer** decides how the space looks and works, and puts it in drawings, visuals and lists.
- **The builder** prices the work, organises the site and builds what the drawings show, following local rules.
- **You** make the final decisions, approve changes and pay for the work and materials.

At KOE we work on design only. Site supervision and purchasing stay with you and your team, which is exactly why the drawings need to answer as many questions as possible on their own.

## Finding the right builder

Ask people you trust for recommendations, and look at work the builder has finished, ideally in person. Then send the same complete set of drawings and lists to two or three builders and ask each one for a detailed quote.

Compare quotes line by line, not just the total. A low price that leaves out the joinery, or assumes a cheaper tile, is not really lower. A good builder will ask questions about the drawings. That is a sign they have read them.

## Before work starts

Hold one call with everyone together: you, the builder and the designer. Walk through the drawings page by page. Then agree on:

- One place for all questions and answers, such as a shared chat or email thread
- Who orders which materials, and when they need to arrive
- The key stages where you want photos before work continues

## During the build

### Photos and short videos

Ask for photos of the site every week, and short videos at important moments. Wide shots show progress. Close-ups show details. Together they let everyone see the site without being there.

### Questions in writing

Questions asked and answered in writing don't get forgotten or misremembered. When an answer changes something, update the drawing too, so the site always works from the latest version.

### Check before things are closed

Some moments matter more than others, because after them the work is hidden or hard to change. Check carefully:

- Before walls are closed: positions of sockets, switches, lights and pipes
- Before tiling: layout, starting point and joint widths
- Before joinery is made: final site measurements
- Before painting: wall and ceiling finish in raking light

## Changes

Changes will happen. A pipe is not where it should be, a material is out of stock, you change your mind. That is normal. Make every change a clear decision, write it down, and check how it affects cost and time before work continues.

## Samples

Before anything is ordered in quantity, ask for physical samples of the main materials: tiles, stone, wood finish, paint, fabric. Approve them in the space, in daylight. A photo of a sample on a screen is not the same as the sample in your hand.

## Why it works

A local builder knows local rules, suppliers and prices, and is on site every day. A designer focused on drawings makes sure every decision is made before it is needed. When both have the same complete set of drawings, distance matters much less than you might think.

For the steps before building begins, read [how remote interior design works](https://koedesign.co/journal/how-remote-interior-design-works).

---

KOE Design: interior design for spaces with a story. Start a project: [contact@koedesign.co](mailto:contact@koedesign.co)
